Integrated Cabinet SolutionsFor Business-Critical Continuity™Knurr® DCM™ RackUser Manual
Installation63.5 Basic Hardware Installation—Nutbars and Spring NutsThe Knurr DCM is designed with T-slots on exposed faces of the aluminum frame memb
Installation7Figure 5 Insert nutbar or spring nut3.6 Frame and Enclosure Configurations3.6.1 Internal Mounting RailsThe Knurr DCM can accommodate rack
Installation83.6.2 Front- and Rear-Mount Rails—Position and AttachFront- and rear-mount vertical rails are installed in the Knurr DCM at the factory a
Installation9Position Rails on 700mm and 800mm Cabinets1. Determine the proper location of the rails.2. Remove center support by loosening the two qui
Installation103.7 Door—Remove and ReverseKnurr DCM doors are removable for convenience when installing or maintaining equipment. They also are reversi
Installation113.7.1 Remove the Door1. Open the door and swing it open about 90 degrees.2. Lift the door slightly until the hinge pins clear the hinge
Installation123.8 Side Panels—Remove and ReplaceKnurr DCM side panels are simple to remove and replace, making it easier to install equipment. Panel r
Options—Installation134.0 OPTIONS—INSTALLATION4.1 Anti-Tilt Kit (Part # 540254G1L)An anti-tilt kit can be installed to stablize the Knurr DCM when ins
Options—Installation144.2 1U Tool-Less Fixed Shelf InstallationThe 1U tool-less fixed shelf (Part # 002185000) has tabs on the front and rear that sli
Options—Installation15Figure 11 1U tool-less telescopic shelf installation4.4 2U Locking Drawer InstallationAn optional 2U drawer (Part # 011139278) w
IMPORTANT SAFETY GUIDELINESSAVE THESE INSTRUCTIONSThis manual contains important instructions that should be closely followed during install
Options—Installation164.5 Power Distribution Unit MountingPower distribution units may be mounted multiple ways in the Knurr DCM rack. They may be mou
Options—Installation174.5.2 Full-Height PDU Mounting BracketsThree models of full-height PDU mounting brackets may be installed for a greater range of
Options—Installation18Figure 14 Full-height PDU mounting brackets4.6 Install RPC™ BDM™ Mounting BracketsThe RPC BDM, used to monitor Liebert MPX and L
Options—Installation194.7 Tool-Less Blanking PanelsTool-less blanking panels can be snapped onto the Knurr DCM 19" rails to block unused portions
Options—Installation204.8 Cluster ConfigurationTwo or more Knurr DCM cabinets of the same height can be connected in a cluster with the optional Clust
Options—Installation214.9 Cable ManagementWhen designing the equipment layout in the Knurr DCM, consider how cables must be run for each configuration
Options—Installation224.10 Cable Access—Top Cover, Back and BaseA fully removable top cover is available on Knurr DCM enclosures. These features are a
Options—Installation23Figure 19 Dress panels along edge of cluster of Knurr DCMsThree-piece Top Cover Cable Management kits for racks within a row (fr
Options—Installation244.11.1 Internal Cable Management TroughsInternal Cable Management Troughs may be installed to support wiring across short spans,
Options—Installation254.12 Attach Cable Management Option—Cable FingersThe Cable Fingers (Part # 010200078) option permits routing cables in the void
iTABLE OF CONTENTS1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Options—Installation26To install Liebert MB mounting brackets on a row of Knurr DCM cabinets:1. Insert the bottom of the mounting bracket through one
Maintenance275.0 MAINTENANCE5.1 Periodic MaintenanceYour Knurr DCM cabinet requires no special maintenance. It should be cleaned periodically, more fr
Specifications286.0 SPECIFICATIONSFigure 25 Knurr DCM model numbersTable 5 Knurr DCM quick-ship part numbersPart # DescriptionD4224442 42U x 24"
Accessories297.0 ACCESSORIESTable 6 Accessories part numbers and descriptionsPart # Description On PageD4224442 42Ux600x1100 Quick Ship Rack with Side
Accessories30539952G1L 42U x 700mm W Vertical Blanking Panel W/cut Outs 2000mm H, Two Pieces539957G1L 42U x 800mm W Vertical Blanking Panel w/Cutouts,
Accessories31011309347 Kit of Four Anchor Kits to Secure Cabinet to Raised Floor540275G1L Lock Insert Kit of Two Lock Inserts and Four Keys000784649 H
Ensuring The High AvailabilityOf Mission-Critical Data And Applications.Emerson Network Power, a business of Emerson (NYSE:EMR),is the global leader i
ii4.11 Top Cover Cable Management Kit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 224.11.1 Internal Cabl
Introduction11.0 INTRODUCTIONThe highly versatile Knurr DCM provide an organized, secure, controlled environment in a single system for sensitive elec
Major Components22.0 MAJOR COMPONENTSA Knurr DCM may have any or all of the components addressed in this section, depending on its configuration.2.1 F
Major Components3To install the Side Panel Lock:1. Insert a key into the lock to use as a handle.2. Remove the locking nut from the cylinder.3. Insert
Installation43.0 INSTALLATION3.1 InspectionUpon receiving a Knurr DCM, examine the packaging for any signs of mishandling or damage. If any damage is
Installation53.3 Unloading the Knurr DCMBefore unloading a Knurr DCM, note the weight of the model (see 6.0 - Specifications. Use at least two people
Komentarze do niniejszej Instrukcji